For production managers. It compares the material issued to finished orders with what their BOMs expect, and shows what was rejected and why. Open Production › Reports › Yield.

Read the report

  1. Pick the dates the orders were completed (default: the last 90 days).
  2. By material adds up expected and used per material across orders; By order shows each order's materials.
  3. Expected is the BOM quantity per unit, scrap included, times the units made (good plus rejected). Used is issued less returned. Over / under is the difference in percent: red above 5 %, amber above 1 %.
  4. Lines issued by Backflush are issued from the BOM, so they show no difference by design.
  5. Rejects by reason lists the reasons given when output was recorded, with the share of what was made of that item.

Read the full guide with your flowwork account

The rest of this page has the steps, screenshots and tips. Anyone at a company that uses flowwork can read every page, and ask the Help assistant about it.

Every step, in order Real screenshots The agents that help
New companies use flowwork free until 31 December 2026
Yield report · Production · flowwork Help Center